A development permit (開発許可) is the prior approval that a person must obtain from the prefectural governor (or, in designated cities and core cities, the mayor) before carrying out a "development act" in a city planning area or quasi-city planning area (City Planning Act, Art. 29). In the Takken exam's land-use restrictions section it is a high-yield topic, usually asked as: "does this plan need a permit?"
This guide walks through the decision order (is it a development act? → which area? → is the site below the threshold? → is there an exemption?) and the building restrictions that follow a permit. The exam applies the law in force on April 1 of the exam year; the text below follows the articles in force on November 27, 2026. The e-Gov revision history shows no enacted change to the articles cited here taking effect by April 1, 2027.
Key takeaways
- A development act (開発行為) is a change in the shape or quality of land made mainly to build buildings or construct specific works (City Planning Act, Art. 4(12)).
- The size below which no permit is needed depends on the area: under 1,000 sq m in an urbanization promotion area (500 sq m in parts of the three major metropolitan regions), under 3,000 sq m in an unzoned city planning area or quasi-city planning area, and under 1 ha outside both. An urbanization control area has no size-based exclusion.
- Agricultural, forestry and fishery buildings and the homes of those who work in them need no permit in any area except an urbanization promotion area. Buildings of public necessity such as stations, libraries and community centers, development carried out as part of certain projects, and emergency measures after a disaster need no permit in any area.
- In a permitted development area, building is generally barred until the completion notice (Art. 37), and after that only the buildings named in the permit may be built (Art. 42).
- The decision order never changes: is it a development act, which area, is the size under the threshold, is there an exemption.
Step 1: Is it a development act?
Both the purpose and the work decide the answer. The purpose must be mainly to build a building or construct a specific work; the work must change the division, shape or quality of the land (re-dividing lots, cutting and filling, turning farmland into a building lot). Putting a building on land that is already ready, without changing its division, shape or quality, is not a development act and needs no development permit. The building itself may still need a separate building confirmation.
Types of specific works
| Type | Examples | Size requirement |
|---|---|---|
| First-class specific works (第一種特定工作物) | Concrete, asphalt and crusher plants; facilities for storing or processing hazardous materials (Act Art. 4(11); Order Art. 1(1)) | No minimum size |
| Second-class specific works: golf courses (第二種特定工作物) | Golf courses (Act Art. 4(11)) | No minimum size |
| Second-class specific works: other large works | Sports and leisure facilities such as baseball fields, tennis courts, athletic tracks, amusement parks and zoos; cemeteries (Order Art. 1(2)) | 1 ha or more |
The contrast to remember: a golf course is a specific work at any size, while a baseball field and similar facilities become specific works only at 1 ha or more.
Step 2: Apply the size threshold for the area
Size below which no permit is needed, by area
| Area | Size below which no permit is needed | Reduction by ordinance |
|---|---|---|
| Urbanization promotion area (市街化区域) | Under 1,000 sq m. Under 500 sq m where the municipality (including Tokyo's special wards) lies wholly or partly in the Metropolitan Region's built-up area or suburban zone, the Kinki Region's built-up area or suburban zone, or the Chubu Region's urban development zone | Where especially needed given the state of urbanization, the prefecture and similar bodies may set a different size by ordinance, from 300 sq m up to under 1,000 sq m |
| City planning area without area division, and quasi-city planning area | Under 3,000 sq m | Likewise, an ordinance may set from 300 sq m up to under 3,000 sq m |
| Urbanization control area (市街化調整区域) | No size-based exclusion (even a small site generally needs a permit) | — |
| Outside both city planning and quasi-city planning areas | Under 1 ha (1 ha or more needs a permit; Art. 29(2), Order Art. 22-2) | — |
Note the word "under". A development of exactly 1,000 sq m in an urbanization promotion area is not below the threshold, so it needs a permit.
Step 3: Check the exemptions
Main development acts exempt from the permit
| Category | What it covers | Where it applies |
|---|---|---|
| Agriculture, forestry, fishery | Buildings for these industries specified by Cabinet Order (barns, greenhouses, compost sheds, farm equipment storage, any building with a building area of 90 sq m or less, and so on) and the homes of the people who run these businesses (Order Art. 20) | Urbanization control areas, unzoned city planning areas, quasi-city planning areas, and areas outside them. Not in urbanization promotion areas |
| Buildings of public necessity | Railway facilities such as station buildings, libraries, museums, community centers, substations and similar (Order Art. 21) | All areas |
| Project implementation | Development carried out as part of an urban planning project, land readjustment project, urban redevelopment project, housing block improvement project or disaster-prevention block improvement project | All areas |
| Emergency after a disaster | Emergency measures needed after a major disaster | All areas |
| Ordinary management and minor acts | Temporary buildings, accessory buildings such as garages and sheds, extensions or rebuilding of 10 sq m or less, and similar (Order Art. 22) | All areas |
| Carried out by the State or prefectures | Instead of obtaining a permit, an agreement with the governor is deemed to be a permit (Art. 34-2) | All areas |
Even among facilities set up by the State or by prefectures and similar bodies, schools, medical facilities (hospitals, clinics, maternity homes) and social welfare facilities are carved out of the public-necessity exemption by Order Art. 21(xxvi).
The permit standard and building restrictions after a permit
Steps after a permit and the building restrictions
| Stage | Rule | Article |
|---|---|---|
| Permit standard | If the application meets the standards, the governor must grant the permit. The standards apply even to a development for the applicant's own home | Art. 33 |
| Development in an urbanization control area | Besides the Art. 33 standards, one of the items of Art. 34 must be met (item 14 requires deliberation by the development review board) | Art. 34 |
| Completion of work | Completion report → governor's inspection → certificate of inspection → public notice of completion | Art. 36 |
| Before the notice | In principle no building may be built and no specific work constructed. Exceptions include temporary buildings for the development work, and a right holder who did not consent to the development acting on that right | Art. 37 |
| After the notice | No building or specific work other than the planned one may be newly built, and a building may not be rebuilt or changed in use to another kind. Exceptions: the governor's permission, or where a use district or similar has been designated for the land | Art. 42 |
| Land in an urbanization control area with no development permit | Without the governor's permission, one may not newly build a building other than an agricultural, forestry, fishery or public-necessity building, or newly construct a first-class specific work (temporary buildings and similar are exempt) | Art. 43 |
Common traps
- Assuming an urbanization control area also has a "small sites need no permit" size rule. It does not; even a small site generally needs a permit.
- Applying the agricultural, forestry and fishery exemption in an urbanization promotion area. It is not available there.
- Reading "under" as "up to and including". A development of exactly 1,000 sq m in an urbanization promotion area is not below the threshold and needs a permit.
- Assuming every public-necessity building is exempt. Schools, medical facilities and social welfare facilities are carved out even when the State or a prefecture sets them up.
- Believing building is allowed once the certificate of inspection is issued. Building opens up only after the governor's public notice of completion, not on issue of the certificate.
Frequently asked questions
How large a development needs a development permit?
The size below which no permit is needed depends on the area: under 1,000 sq m in an urbanization promotion area (under 500 sq m in municipalities touching certain areas of the Metropolitan, Kinki and Chubu regions), under 3,000 sq m in an unzoned city planning area or quasi-city planning area, and under 1 ha outside those areas. A development at or above the threshold generally needs a permit. An urbanization control area has no size-based exclusion.
Does a small development in an urbanization control area still need a permit?
Yes. The size-based exclusion in City Planning Act Art. 29(1)(i) covers only urbanization promotion areas, unzoned city planning areas and quasi-city planning areas; it does not cover urbanization control areas. A permit is still unnecessary if another exemption, such as the one for agricultural buildings, applies.
Does developing land for a farmer's house need a permit?
A development for a building used as the home of a person engaged in agriculture needs no permit at any size in an urbanization control area, an unzoned city planning area, a quasi-city planning area, or outside those areas (Art. 29(1)(ii) and (2)(i)). The exemption is not available in an urbanization promotion area.
Is building a golf course or baseball field a development act?
Yes, if the land work is done to construct a specific work. A golf course is a second-class specific work at any size. Sports and leisure facilities such as baseball fields, tennis courts, amusement parks and zoos, and cemeteries, become second-class specific works only at 1 ha or more.
When can I build after receiving a development permit?
After the work is reported complete, the governor inspects it, issues a certificate of inspection and then publicly announces completion. Before that notice, building is barred except for exceptions such as temporary buildings for the work (Art. 37). After the notice, only the buildings planned in the permit may be built unless the governor permits otherwise or another exception applies (Art. 42).
Is a development permit the same as a building confirmation?
No. A development permit is a City Planning Act permission for changing the division, shape or quality of land. A building confirmation checks that a building plan complies with building standards law. They are separate systems and both may be required.
In the same land-use restrictions section, also see the differences between Articles 3, 4 and 5 of the Agricultural Land Act, which comes up alongside development permits when farmland becomes a building lot, and building coverage and floor area ratio. Look up terms in the glossary.
Practice development permit questions on real exams
Work through past exam questions until the decision order feels automatic, then check your score by area.
Sources
- City Planning Act (e-Gov Law Search) – Arts. 4, 29, 33, 34, 34-2, 36, 37, 42, 43
- Enforcement Order of the City Planning Act (e-Gov Law Search) – Arts. 1, 19, 20, 21, 22, 22-2
- RETIO: Real Estate Transaction Promotion Center, Takken exam information – Questions follow the law in force on April 1 of the exam year